Update PoR Executor V3 Robot
01Summary
Re-enable Aave Proof of Reserve on Avalanche by canceling the existing automation robot and registering a new PoR system compatible with Aave v3.1, which eliminates the need to set LTV to zero during emergency actions and preserves the LTV rollback mechanism.
- Type
- protocol addition
Key changes
- Cancel existing Aave Robot automation for Proof of Reserve(high)
- Grant RISK_ADMIN role to new PoR Executor V3.1 contract on Aave v3 Avalanche(high)
- Withdraw LINK funds from existing Robot PoR(medium)
- Register new PoR Robot with improved compatibility with Aave v3.1(high)
- Refill new PoR Robot with 15 LINK from Aave Collector(medium)
Notable concerns
- Requires multiple blocks to pass between canceling existing automation and withdrawing funds
- New system eliminates LTV zero-setting requirement which changes emergency action behavior
- Execution depends on specific ordering guarantees between two payloads
Generated by Kvorum
02Description
Simple Summary
Proposal to re-enable Aave Proof of Reserve on Avalanche, after temporarily halting the system during the Aave v3.1 upgrade.
Motivation
With the release of Aave V3.1, it is no longer necessary to set the asset’s LTV to zero before freezing during the execution of an emergency action on a Proof of Reserve alert, as the protocol does both actions in batch.
Moreover, setting LTV to zero that way would break the “rollback” mechanism (pendingLtv) of LTV back to normal value on unfreeze.
Specification
The proposal is separated into two payloads because multiple blocks must pass between canceling the existing Aave Robot automation and withdrawing funds from it. The order of execution is guaranteed by the fact that it is impossible to withdraw funds before the robot is canceled.
The two payloads do the following:
-
Cancels the existing Aave Robot automation for PoR, by calling
cancel()on the Aave Robot operator contract. -
Activates the new PoR system by:
2.1. Granting Aave v3 Avalanche RISK_ADMIN role to the new PoR executor contract, by calling
addRiskAdmin()on the ACLManager contract.2.2. Withdrawing LINK funds from the existing Robot PoR by calling
withdrawLink()on the Robot operator contract.2.3. Registering a new PoR Robot, by calling
register()on the Robot operator contract.2.4. Refilling the new PoR Robot with 15 LINK from the Aave Collector.
The new contracts involved are the following:
| Contract | Address |
|---|---|
| Proof Of Reserve Executor V3.1 | 0xB94e515615c244Ab25f7A6e592e3Cb7EE31E99F4 |
| Proof Of Reserve Robot | 0x7aE2930B50CFEbc99FE6DB16CE5B9C7D8d09332C |
References
- Implementation: AaveV3Avalanche - Cancel existing robot, AaveV3Avalanche - Register new robot
- Tests: AaveV3Avalanche - Cancel, AaveV3Avalanche - Register
- New Proof of Reserve Executor
- Discussion
Copyright
Copyright and related rights waived via CC0.
03Mismatch analysis
A calldata-vs-description analysis is not generated yet. Review the decoded actions →
04Actions
This proposal carries no on-chain actions.
05Tally
Summed from votes
06Voters
No votes recorded yet.
07Forum
No forum thread is confidently linked to this proposal.